Central battery units and controllers
Central battery units and their controllers set up and commissioned — changeover, circuit monitoring and alarm reporting configured and checked.
Life-safety lighting has to work the one time it really matters. We commission central battery units and their controllers, prove the emergency lighting they feed, and hand over the records inspectors expect to see — experience that includes central battery systems across an airport cargo operation.
Central battery units and their controllers set up and commissioned — changeover, circuit monitoring and alarm reporting configured and checked.
Every emergency luminaire on every circuit proven to come on when it should, with locations and addresses recorded.
Changeover on mains failure and full rated-duration tests carried out and recorded, so the system is proven at handover — not at the first real outage.
Emergency and normal lighting set up to work together, with lighting controls and backup power linked across every location.
Automatic test scheduling and fault reporting configured and, where it's wanted, status passed to the BMS so failures don't wait for the next manual check.
Witnessing by you, your CxA or the inspector, then test records, as-builts and logbook information handed over for the O&M.
BS 5266-1 is the UK code of practice for emergency lighting in non-domestic premises. It expects a new installation to be commissioned and proven before handover — luminaires in the right places, working on mains failure for their full rated duration — and for the results to be recorded so the building's responsible person can show compliance.
Central battery systems (covered by BS EN 50171) power emergency luminaires from a central unit rather than a battery in each fitting. They make maintenance and testing easier on large sites, but there's more to commission: the central unit, its sub-circuits, circuit monitoring, changeover devices and often an addressable controller that schedules tests and reports faults.
On complex sites the emergency system rarely lives on its own. It shares drawings, circuits and often controllers with the normal lighting controls — which is why we commission both sides and make sure they agree with each other.
Confirm luminaires, circuits and central units are installed and powered, and flag gaps before the test programme starts.
Units and controllers configured, circuits and monitoring set up, and system status checked.
Simulated mains failure on each circuit, every luminaire checked, faults logged and chased to close-out.
A full rated-duration discharge test, with the results recorded.
Witnessed by you, your CxA or the inspector, with snags closed out before sign-off.
Test records, as-builts and logbook information handed over for the O&M, ready for the routine testing that follows.
Commissioned central battery units and controllers across several locations, linking lighting controls and backup power, plus the lighting throughout an automated cargo handling centre.
Tell us the systems, the sector and the programme — we'll tell you straight whether we're the right fit and what it takes to sign it off clean.